Workshop shuffle 20200201

20200410 This plan superseded as a result of Covid19 reshuffle

Objective:

  • Primary:
    • Bay 2: 5 PBalls in a row backing to Aluminium – DONE
    • Bay 3: 8 x 15D cabs in rightside Lundia static wall – DONE
  • Secondary:
    • 55″ TV back at Bay 3 window – DONE
    • Fasetech Rig more room for rotate (Swap 3dr cabs for Tall white cabs) – DONE
    • SimXP rig back under Bay 3 window able to use 55″ TV – DONE

Experimental:

  • NO cabs against gge door
  • All mobile machine trolleys under window Bay 2:
    • Allows room to run Laser Cutter in temporary location under window Bay 2
    • Start to free up Bay 1 space for 3030 3.65m lengths

Sequence:

  1. Fix STTNG (MPU089 replacement)
  2. Fix JD (MPU089 back in)
  3. Move Mill:
    • 1 x 3D cab, 2 x 11d Cabs to temporary
    • Move mill to experimental
  4. Move Racetech rig temporary towards Bay 1
  5. Move STTNG / TZ to Bay 2, 5 PB in a row
    • SimXP Rig to temporary
    • Move PBs
      • leftmost no topper has easy access for work
      • Middle = least valuable as is moved in/out for alum access
      • Left to right:
        1. TZ
        2. STTNG
        3. JD
        4. IJ
        5. CFTBL
  6. Move Bay 3 toilet wall White cabs out temporary
    • Gun cab to temporary
  7. Move 5 x 3dr cabs to Bay 3 toilet wall
    • Had to find least deep cabs (<620mm vs ~640mm)
  8. Move Tevo Little monster + Anycubic delta + crates to Toilet wall 5 x 3dr cabs
  9. Dissemble Lundia where Little monster etc was
  10. Move solder station to toilet wall left most?
    • Requires shutting down servers & W7Server PC
    • Put servers back on top
      • Consider water protection re overhead pipes
      • Move 2nd servrs router, common PSU, temporary for now
    • Find tempory location for W7Server, near Bay 2 window if needed
    • Find temporary location for 192.168.1.102
      • Is in previous location still in bay 2 ceiling
  11. Move 100D cab to toilet wall
  12. Move Gun Cab to toilet wall
  13. Move tall white cabs to road wall covering from Bay window to Bay 2 window
  14. Move SIMXP rig to Bay 3 window
  15. Move Fasetech Rig back under beam separating Bays 2 & 3
  16. Bolt Gun Cab to 100D
  17. Move new printer to top of 100D
  18. Laser Cutter to Bay 2 window temporary
  19. Bay 3: Lundia right side static shelving:
    • Move stock off Lundia to temporary
    • Pull down existing Lundia
    • Move 500×400 15D cab to temporary elsewhere leaving only 400×460 15D cab
    • Add 7 x 15D cabs along wall
    • Build up 400mm deep Lundia on top of 8 x 15D Cabs to previous height (Fix to wall etc)
    • Move stock back to Lundia etc
    • Bolt small router to beam (fire shield?)
  20. Bay 1: Extend benches form 5 x cabs to 6 cabs
    • Middle row swap out 4 x 3D cabs for remaining 15D cabs including 400×500 15D
  21. Remaining 3D cabs temporary in middle of Bay 1

Todos:

  • Dust cover for new printer
  • High shelf along top of Toilet wall (for small servers?)
  • Can we move 1 x 500D steel cab upstairs?
  • Laser cutter ventilation
  • Security Cameras
    • Server
    • Cameras