20200410 This plan superseded as a result of Covid19 reshuffle
Objective:
- Primary:
- Bay 2: 5 PBalls in a row backing to Aluminium – DONE
- Bay 3: 8 x 15D cabs in rightside Lundia static wall – DONE
- Secondary:
- 55″ TV back at Bay 3 window – DONE
- Fasetech Rig more room for rotate (Swap 3dr cabs for Tall white cabs) – DONE
- SimXP rig back under Bay 3 window able to use 55″ TV – DONE
Experimental:
- NO cabs against gge door
- All mobile machine trolleys under window Bay 2:
- Allows room to run Laser Cutter in temporary location under window Bay 2
- Start to free up Bay 1 space for 3030 3.65m lengths
Sequence:
- Fix STTNG (MPU089 replacement)
- Fix JD (MPU089 back in)
Move Mill:1 x 3D cab, 2 x 11d Cabs to temporaryMove mill to experimental
Move Racetech rig temporary towards Bay 1Move STTNG / TZ to Bay 2, 5 PB in a rowSimXP Rig to temporaryMove PBsleftmost no topper has easy access for workMiddle = least valuable as is moved in/out for alum accessLeft to right:TZSTTNGJDIJCFTBL
Move Bay 3 toilet wall White cabs out temporaryGun cab to temporary
Move 5 x 3dr cabs to Bay 3 toilet wallHad to find least deep cabs (<620mm vs ~640mm)
Move Tevo Little monster + Anycubic delta + crates to Toilet wall 5 x 3dr cabsDissemble Lundia where Little monster etc wasMove solder station to toilet wall left most?Requires shutting down servers & W7Server PC- Put servers back on top
- Consider water protection re overhead pipes
- Move 2nd servrs router, common PSU, temporary for now
- Find tempory location for W7Server, near Bay 2 window if needed
Find temporary location for 192.168.1.102Is in previous location still in bay 2 ceiling
Move 100D cab to toilet wallMove Gun Cab to toilet wallMove tall white cabs to road wall covering from Bay window to Bay 2 windowMove SIMXP rig to Bay 3 windowMove Fasetech Rig back under beam separating Bays 2 & 3Bolt Gun Cab to 100DMove new printer to top of 100DLaser Cutter to Bay 2 window temporary- Bay 3: Lundia right side static shelving:
Move stock off Lundia to temporaryPull down existing LundiaMove 500×400 15D cab to temporary elsewhere leaving only 400×460 15D cabAdd 7 x 15D cabs along wallBuild up 400mm deep Lundia on top of 8 x 15D Cabs to previous height (Fix to wall etc)Move stock back to Lundia etc- Bolt small router to beam (fire shield?)
- Bay 1: Extend benches form 5 x cabs to 6 cabs
- Middle row swap out 4 x 3D cabs for remaining 15D cabs including 400×500 15D
- Remaining 3D cabs temporary in middle of Bay 1
Todos:
- Dust cover for new printer
- High shelf along top of Toilet wall (for small servers?)
- Can we move 1 x 500D steel cab upstairs?
- Laser cutter ventilation
- Security Cameras
- Server
- Cameras