Tutanekai Shed Repairs

  • Internal
    • Left 2.35 x 5.2m
    • Middle 6.75 x 5.2m
    • Right 3.28 x 5.2m
    • Total 11×5.2 = ~64m2
  • External:
    • If re-cladding far end
      • 5.4W x 3.4H (Highest point)
      • ~2.6m to start of roof pitch (Shallow pitch roof)

Fixing end bottom plate

  • https://www.bunnings.co.nz/190-x-45-sg8-h3-2-treated-green-radiata-timber-framing-random-lengths_p0276232 bought from Mitre 10 at > $18lm
  • I already have damp proof course
  • Bowmac Bottom Plate Screw Bolt (10/bag) M10 x 140mm Electro Galvanised
    • “Drill 10mm diameter hole x 95mm minimum depth” per https://miteknz.co.nz/wp-content/uploads/2021/06/BOWMAC-Screw-Bolt-Producer-Statement.pdf
  • LUMBERLOK Stud to Bottom Plate Fixing Zinc Galvanised

Fixing far end wall Fibre Cement cladding

  • If re-cladding far end
    • 5.4W x 3.4H (Highest point)
    • ~2.6m to start of roof pitch (Shallow pitch roof)
  • Repairing
    • Flashing:
      • Horizontal: https://www.placemakers.co.nz/online/cladding/fibre-cement-accessories/fibre-cement-accessories/flashings/horizontal-flashing-3000mm/p/3100872 $28.59EA
      • Vertical: https://www.placemakers.co.nz/online/cladding/fibre-cement-accessories/fibre-cement-accessories/flashings/6-x-2400mm-rouge-dry-area-2700mm/p/3160116

Far end roof soffit/barge board/iron flashing

  • approx ridge to edge each side = 3.45m
  • near end barge board is 135mm x 20mm
  • far end overhang for soffit is 135mm + barge board
  • Parts:
    • Steel flashing 90 deg 2 x ~3.45m
    • Fascia/Barge board 135×18 2 x ~3.45m
      • Possibly Soffit molding 2 x 3.45m
    • Soffit cement board 2 x 3.45m x 155mm
      • https://www.placemakers.co.nz/online/cladding/fibre-cement-accessories/hardisoffit/hardisoffit/lining-45-x-2400-x-450mm/p/3100021

Nomenclature:

  • Right side shed = SHOP
  • Left side = Machine Room
  • Middle = Garage/Gge

SHOP (Right side)

Right side roof building paper has failed, concern is condensation DONE 202311

On right side only

  1. Removed Iron
  2. New building paper
  3. Refixed iron

(In perfect world would’ve put down Wire mesh galv min 0.9mm)

Lining walls

  • Leave as is where window may go?
  1. Clean
  2. strip of remove existing shelves etc
  3. Remove all electrical
  4. Lay vapour barrier (over existing timber unfortunately)
  5. Insulation into cavities
  6. Plasterboard

Right side shed: Ceiling

  1. Add 4×2 ceiling beams
  2. Gib
  3. Electrical
  4. Insulation